Free tool

Tempo check: is this task ready for WDD?

For developers planning a long, unattended run. Making something for fun? Skip this and start in the builder.

Answer 10 questions about your task. The tempo check tells you whether it suits Whiplash Driven Development now, almost, or not yet, and what to fix first. The two that matter most: is there an automatic check of "done", and is there a safe place to run?

  1. Can a command tell you, with no human judgement, whether the goal is met?

    A test suite, a build, a benchmark with a threshold, a diff against a known-good output, a frame-rate counter.

  2. Does that check finish in under about five minutes?

    Every round of the loop runs it. A slow check means few rounds and a large bill.

  3. Can progress be measured in small steps (tests passing, functions matching, errors left)?

    A number that goes up lets the agent and you see it is moving.

  4. Can the agent work somewhere it cannot do lasting damage?

    A container, a VM, a throwaway branch or worktree, no production credentials.

  5. Is the work under version control, so every round can be committed and rolled back?

    Git with a commit per round is the safety net of WDD.

  6. Is "done" written down in a sentence or two that you would sign?

    If you cannot say what done looks like, the agent cannot either.

  7. Would cheating be hard to hide (deleting tests, hard-coding answers, skipping checks)?

    Protected test files, a hidden holdout set or a review of the diff all make cheating visible.

  8. Have you set a budget: a number of rounds, hours or dollars after which you stop?

    Persistence without a budget is how a weekend turns into a large bill.

  9. Is the hard part mechanical rather than a matter of taste (design, wording, product decisions)?

    WDD grinds; it does not decide what good looks like.

  10. Will a person read the final diff before it ships?

    Green checks are necessary, not sufficient.

Your result

0 of 10 answered. Answer them all to see whether the task is ready.